Smart Future Roadmap
  • Economy
  • Investing
  • Politics
  • Stocks
No Result
View All Result
  • Economy
  • Investing
  • Politics
  • Stocks
No Result
View All Result
Smart Future Roadmap
No Result
View All Result
Home Investing

Munda Gold Mine Mining Progresses: First Blast

June 19, 2025
in Investing
Munda Gold Mine Mining Progresses: First Blast

Auric Mining Limited (ASX: AWJ) (Auric or the Company) is pleased to provide an update on mining of the Starter Pit at the Munda Gold Mine, 5km from Widgiemooltha, Western Australia.

Highlights

  • First blast 17 June 2025.
  • Mining is well underway in Starter Pit.
  • Approximately 70,000 BCM mined in first month.
  • Largely free-dig to date.
  • Site preparation for Waste Dump and ROM pads completed.
Management Comment

Managing Director, Mark English, said:

“It’s a momentous time in our progression and development of the Company, we are delighted.

“Mining is in full swing and all activities are progressing as we expected. Nothing is holding us back. We are achieving our targets and are exactly where we expected to be in the mine development.

“We are pleased to be monetising our major asset in such a bullish gold market, the timing is excellent. It is a great place to be as an unhedged gold producer,” said Mr English.

Approximately 70,000 BCM (Bank Cubic Metres) of material have been mined at Munda over the first 4 weeks of operations from a pit design encapsulating 380,000 BCM. Mining to this stage has been largely free-dig with the first blast completed 17 June 2025.

Auric personnel are utilising a dry hire fleet comprising a 125t excavator and four 40t articulated ‘Moxi’ dump trucks together with relevant ancillary equipment.

Both RC grade control and blast hole drilling, together with blast supervision is managed by Kalgoorlie-based Total Drilling Services Pty Ltd.

The Company has estimated that approximately 125,000 tonnes of ore will be extracted from the Starter Pit at a grade of 1.8g/t Au1. Most of that ore will be mined toward the base of the Starter Pit, during the last two months of operations. The Starter Pit is scheduled for completion in October.

Munda has an estimated resource of 145,000 ounces of gold at a 0.5g/t cut-off2. Once the Starter Pit is finished Auric expects to complete detailed planning for a larger pit, to commence in 2026.

The Company is fully funded to mine the Starter Pit at Munda from the proceeds of gold sales from the Jeffreys Find Gold Mine near Norseman.

Click here for the full ASX Release

This post appeared first on investingnews.com

Previous Post

Freegold Achieves over 90% Gold Recovery Using BIOX® and greater than 92% Gold Recovery using POX – Additional Metallurgical Work Remains Ongoing

Next Post

Extensions and New Zones of High Grade Tin at Bygoo North

Next Post
Extensions and New Zones of High Grade Tin at Bygoo North

Extensions and New Zones of High Grade Tin at Bygoo North

    Join our mailing list to get access to special deals, promotions, and insider information. Your exclusive benefits await! Enjoy personalized recommendations, first dibs on sales, and members-only content that makes you feel like a true VIP. Sign up now and start saving!


    By opting in you agree to receive emails from us and our affiliates. Your information is secure and your privacy is protected.

    Recent News

    ‘Maine’s Mamdani’: Maine GOP chief issues warning about new challenger looking to oust Susan Collins

    ‘Maine’s Mamdani’: Maine GOP chief issues warning about new challenger looking to oust Susan Collins

    August 22, 2025
    Federal judge rules Trump appointee Alina Habba is unlawfully serving as US attorney

    Federal judge rules Trump appointee Alina Habba is unlawfully serving as US attorney

    August 22, 2025
    Pentagon unveils new medal for troops deployed in Trump’s southern border crackdown

    Pentagon unveils new medal for troops deployed in Trump’s southern border crackdown

    August 22, 2025
    Zelenskyy seeks ‘strong reaction’ from US if Putin is not ready for bilateral meeting

    Zelenskyy seeks ‘strong reaction’ from US if Putin is not ready for bilateral meeting

    August 22, 2025
    Smart Future Roadmap

    Browse by Category

    • Economy
    • Investing
    • Politics
    • Stocks

    Recent News

    ‘Maine’s Mamdani’: Maine GOP chief issues warning about new challenger looking to oust Susan Collins

    ‘Maine’s Mamdani’: Maine GOP chief issues warning about new challenger looking to oust Susan Collins

    August 22, 2025
    Federal judge rules Trump appointee Alina Habba is unlawfully serving as US attorney

    Federal judge rules Trump appointee Alina Habba is unlawfully serving as US attorney

    August 22, 2025
    • About us
    • Contacts
    • Privacy Policy
    • Terms and Conditions
    • Email Whitelisting

    Copyright © 2025 smartfutureroadmap.com | All Rights Reserved

    No Result
    View All Result
    • Economy
    • Investing
    • Politics
    • Stocks

    Copyright © 2025 smartfutureroadmap.com | All Rights Reserved